Studio MG Architects
  Contact Us
LINDON BENNETT SCHOOL

The headmaster of this special needs school required the building work for this extension to be undertaken without interrupting the day to day running of the school. He also needed more facilities without having to build a new school and wanted to use the latest environmental and design techniques to save on running and maintenance costs. Specialist disabled equipment was installed throughout.

Client: London Borough of Hounslow
Architect: Studio MG Architects
Construction cost: £ 750,000
Constuction time: 44 weeks

Lindon Bennet School 1 --- Lindon Bennet School 2 ---
CONTACT US   < back
© 1996-2008 Studio MG Architects, London. All rights reserved