|
|
|

|
The headmaster of this special needs school
required the building work for this extension to
be undertaken without interrupting the day to day
running of the school. He also needed more
facilities without having to build a new school
and wanted to use the latest environmental and
design techniques to save on running and
maintenance costs. Specialist disabled equipment
was installed throughout.
Client: London Borough of Hounslow
Architect: Studio MG Architects
Construction cost: £ 750,000
Constuction time: 44 weeks
|
|
 |


|
|
|
|
|
|
| © 1996-2008 Studio MG Architects, London. All rights reserved |
|