Studio MG Architects
  Contact Us
ST. AUBIN SPORTS CENTRE

John Dyer-Grimes with Kerosene architects won an open competition to design a new sports centre for a French suburb. Their idea was to create a bold aerodynamic building, which provides different elevations to each function. A wave shaped roof was introduced to allow spectacular light effects into the main gymnasium. The timber clad back elevation sits in harmony with the grass football pitches.

Client: St.Aubin Council
Architect: John Dyer-Grimes / Kerosene
Construction cost: £ 2,500,000
Construction time: 40 weeks

ST. AUBIN SPORTS CENTRE 1 --- ST. AUBIN SPORTS CENTRE 2 --- ST. AUBIN SPORTS CENTRE 3
CONTACT US   < back
© 1996-2008 Studio MG Architects, London. All rights reserved