Studio MG Architects
  Contact Us
EAST LONDON CENTRE

Studio MG Architects were asked to transform a damp basement and retail unit, into a smart contemporary office and training headquarters for the East London area. Bold colours and modern design and large signage were used. An extra challenge was that the client needed to keep the offices open while the works were being carried out. This fast track project was completed on time and budget and has set a benchmark standard for the area.

Client: London East Training & Enterprise Council
Architect: Studio MG Architects
Construction cost: £ 500,000
Constuction time: 24 weeks

East 1 --- East 2 --- East 3
CONTACT US   < back
© 1996-2008 Studio MG Architects, London. All rights reserved