|
|
|

|
Studio MG Architects were asked to transform a
damp basement and retail unit, into a smart
contemporary office and training headquarters for
the East London area. Bold colours and modern
design and large signage were used. An extra
challenge was that the client needed to keep the
offices open while the works were being carried
out. This fast track project was completed on time
and budget and has set a benchmark standard for
the area.
Client: London East Training & Enterprise Council
Architect: Studio MG Architects
Construction cost: £ 500,000
Constuction time: 24 weeks
|
|
 |


|
|
|
|
|
|
| © 1996-2008 Studio MG Architects, London. All rights reserved |
|